Choose language
Close

IM AI Data Center (Design Stage)

IM AI Data Center (Design Stage)
    Time2025
    Products Used
    20MW at phase 1, 80MW in total
    Construction mode: one-story steel structure building + IT/power/cooling skid
    Offering IT/power/cooling skid solution
    IT rack: NVIDIA blackwell B200 liquid cooling server
    Liquid cooling rack 120kW


Subscribe to the SolisStorage Newsletter now.

I agree to the Privacy Policy.

Copyright © 2026 TeraCule. All Right Reserved.

Privacy Policy Made by VTHINK

Global

67 AYER RAJAH CRESCENT, #02-10, SINGAPORE 139950

COPYRIGHT 2026 © TeraCule. POWERED BY VTHINK